Skip to main content
KNOWLEDGE BASE

ITM & Inspections

NFPA 25 inspection, testing, and maintenance guides β€” frequency tables, test procedures, and field checklists

πŸ”
← Back to Knowledge Base

Published articles

NFPA 25 β€” ITM of Water-Based Fire Protection
Complete reference for NFPA 25 inspection, testing, and maintenance frequencies across all water-based fire protection systems
β†’
NFPA 25 ITM Frequency Table (Interactive Tool)
Searchable, filterable table of every NFPA 25 inspection, testing, and maintenance requirement β€” sort by frequency, component, or task
β†’
Wet Sprinkler System β€” The Standard of Protection
Full NFPA 25 maintenance schedule from weekly gauge checks to 5-year internal pipe inspection
β†’
Dry Sprinkler System β€” Complete Guide
Low-point drain checks, annual trip test, air compressor maintenance per NFPA 25
β†’
Pre-Action Sprinkler System β€” The Double Interlock
Quarterly alarm test, annual partial-flow trip test, 3-year full-flow trip test per NFPA 25 Β§13.4.3
β†’
Deluge Sprinkler System β€” All Sprinklers, All at Once
Annual trip test, full-flow tests every 3 years per NFPA 25 Β§13.4.3
β†’
Sprinkler Heads β€” The First Responders
Quarterly visual inspection, 20-year replacement testing, spare head requirements per NFPA 25 Β§5
β†’
Fire Pump β€” The Heart of the System
Weekly churn test, annual flow test at churn/100%/150%, diesel run requirements per NFPA 25 Β§8
β†’
Jockey Pump β€” The Pressure Maintainer
Start frequency observation during weekly churn and annual flow tests, cycling indicators per NFPA 25 Β§8
β†’
Jockey Pump Controller
Start/stop set-point verification, cycling observation, and troubleshooting per NFPA 20 Β§4.26
β†’
Control Valve β€” The Authority
Weekly position verification, annual exercise, tamper switch supervision per NFPA 25 Β§13.1
β†’
Post Indicator Valve (PIV)
Monthly inspection, semiannual tamper switch test, annual operation per NFPA 25 Β§13.3
β†’
Waterflow Switch β€” The First Alert
Quarterly alarm test via inspector's test station, retard timing verification per NFPA 25 Β§5.3.3
β†’
Tamper Switch β€” The Watchdog
Quarterly supervisory signal test, valve position verification per NFPA 25 Β§13.1
β†’
Pressure Switch β€” The Trigger
Quarterly testing via inspector's test or valve operation; pump start, alarm, and supervisory switch verification per NFPA 25
β†’
Inspector's Test Station β€” Simulating the Emergency
Quarterly waterflow alarm test procedure, dry system trip time recording per NFPA 25 Β§5.3.3
β†’
Alarm Check Valve β€” The Heart of the Wet Riser
Quarterly alarm test via inspector's test station, retard chamber inspection, trim valve operation per NFPA 25 Β§13.3
β†’
Dry Pipe Valve
Annual trip test, priming water level check, 5-year internal inspection per NFPA 25 Β§13.4
β†’
Check Valve
5-year internal inspection of clapper, seat, and hinge per NFPA 25 Β§13.4.2
β†’
Backflow Preventer
Annual forward flow and backpressure test, 5-year internal inspection per NFPA 25 Β§13.6
β†’
Fire Department Connection β€” The Lifeline
Quarterly visual inspection, 5-year internal check valve inspection per NFPA 25 Β§13.8
β†’
Water Motor Gong
Quarterly mechanical alarm test concurrent with waterflow switch test per NFPA 25 Β§5.3.3.2
β†’
Air Compressor β€” The Lungs of the Dry System
Weekly/monthly gauge inspections, supervisory pressure maintenance, annual trip test verification per NFPA 25
β†’
Sprinkler System Controller (FACU)
Semiannual tamper switch test, annual waterflow alarm test, battery testing per NFPA 25/72
β†’
Pressure Gauges
Weekly (dry) and monthly (wet) gauge inspection, 5-year replacement or recalibration per NFPA 25 Β§5.2.4
β†’
System Drains & Drum Drips
Annual main drain test procedure, auxiliary drain maintenance on dry systems per NFPA 25 Β§13.2.5
β†’
Test Header β€” The Flow Test Manifold
Annual fire pump flow testing procedure, Pitot tube readings, acceptance curve plotting per NFPA 25 Β§8.3
β†’
Hose Connections & Standpipes
Quarterly inspection, annual operation, 5-year flow testing per NFPA 25 Β§6
β†’
Piping
Annual visual inspection of hangers and braces, 5-year obstruction investigation per NFPA 25 Β§14
β†’
Spare Sprinkler Cabinet
Annual inspection of spare sprinkler stock and wrench per NFPA 25 Β§5.2.1.3, Β§5.4.1.5
β†’
Fire Doors (NFPA 80)
13-point annual inspection checklist β€” self-closing, latching, labeling, clearances per NFPA 80 Β§5.2
β†’
Portable Fire Extinguishers (NFPA 10)
Monthly visual, annual service, 6-year internal inspection, 12-year hydrostatic test per NFPA 10
β†’
Kitchen Hood Suppression (NFPA 96)
Daily visual checks, semiannual professional service, fusible link replacement per NFPA 96 Β§11
β†’
Fire & Smoke Dampers
Annual operational test, fusible link inspection, accessibility verification per NFPA 80
β†’

Coming soon

Main Drain Test β€” Procedure & Interpretation
Obstruction Investigation per NFPA 25 Β§14
Fire Alarm ITM β€” NFPA 72 Chapter 14