Skip to main content
🧰 SAMEKTRA SERVICES →
HOMEENCYCLOPEDIA

Healthcare compliance

CMS Conditions of Participation, TJC standards, ASHE resources, and ILSM guidance

🔍Suggested: Wet Fire Sprinkler System. Press Tab to fill it in.
← Back to Knowledge Base

Published articles

“Drop Everything You’re Doing,” They Say. “The Joint Commission Is Here.” What Life Safety Surveyors Focus On
A practical guide to Joint Commission Life Safety surveys: the first hour, document review, what gets a closer look on the building tour, offsites, and ten pointers. By Stanislav Samek.
→
Relocatable Power Taps in Healthcare: Can You Mount a Power Strip to the Wall?
NEC 400.8/400.12 regulates the cord, not the strip; UL 1363 vs 1363A; why NFPA 99 §10.2.3.6 requires attaching the strip to the equipment inside the patient care vicinity; CMS K-920, TIA 12-5, and the Georgia 2012-vs-2024 crosswalk. By Miller Brown.
→
Field Observation #003: This Hatch Is Fire Rated… Will It Perform?
Sheff's Field Observations — a labeled fire-rated hatch that didn't self-close, and the five-checkpoint assembly review that catches it. Field find by Jarell Sheffield.
→
Field Observation #002: A Smoke Detector Is Present — But Is It Compliant?
Sheff's Field Observations — a smoke detector positioned too close to an HVAC vent, airflow effects on detection, and the one-ceiling-tile rule of thumb. Field find by Jarell Sheffield.
→
Field Observation #001: Is This Delayed Egress Stair Door Compliant?
Sheff's Field Observations — a construction-turnover lesson on delayed egress signage, occupant understanding, and complete-system review. Field find by Jarell Sheffield.
→
Soiled Utility vs. Soiled Holding: Same Room, or Two Different Rooms?
FGI separates them by fixtures, NFPA 101 and ASHRAE 170 do not separate them at all — plus the 64-gallon room threshold vs the receptacle threshold, and why 2012 and 2024 disagree
→
The Joint Commission Binder: Can You Find It in 60 Seconds?
The 2026 PE chapter and Survey Process Guide, binder architecture right-sized to your facility, the seven-element test every ITM record must pass, and free templates
→
LSRA & ILSM — Life Safety Risk Assessment & Interim Life Safety Measures
All 11 ILSMs explained, ASHE templates, TJC survey prep, and CMS K-tag guidance
→
CMS K-Tags for Fire Safety — Complete Reference
Every fire safety K-Tag explained — K-0029 through K-0072, NFPA 101/99 mapping, common survey deficiencies
→
Hazard Vulnerability Assessment (HVA)
Kaiser model scoring, CMS requirements, Georgia GEMA resources, and interactive HVA scoring tool
→
TJC Physical Environment (PE) Standards
PE chapter structure, key standards (PE.01–PE.03), SOC/PFI, annual and triennial assessments, common survey findings
→
Healthcare Occupancy (NFPA 101 Ch. 18/19)
Defend-in-place strategy, corridor and door requirements, suite arrangements, and hazardous areas
→
PCRA — Pre-Construction Risk Assessment
Four PCRA risk domains, ICRA relationship, barrier classes I–IV, ILSM triggers, and documentation
→
Smoke Compartments in Healthcare
22,500 sq ft maximum, 1-hour smoke barriers, door requirements, and defend-in-place support
→
CMS Survey Process for Fire Safety
Survey types, Life Safety Code survey focus areas, Immediate Jeopardy, and Plan of Correction
→
ASHE Fire Safety Compliance Toolkit
ASHE resources, ILSM templates, compliance calendar, Healthcare Fire Safety Week, and best practices
→

Coming soon

NFPA 99 — Health Care Facilities Code Overview
Medical Gas Systems & ASSE 6000