🧰 SAMEKTRA SERVICES →
Inspection report in — signed closeout letter out
For contractors and facility managers: upload the inspection report and the letter is written for you — system, property, contractor, every deficiency, the governing standards, the checklist and the certification. Check it, download it, sign and date. A minute, not half an hour.
1 · Upload the report2 · Check the letter3 · Download, sign & date
Drop the inspection report here
Fire alarm, sprinkler, fire pump, standpipe, backflow, clean agent, kitchen hood, extinguishers, emergency lights, fire doors, dampers, delayed egress / access control. PDF or Word (.docx) — typed or scanned.